Saturday, September 20, 2008

In Preparation

Way back when we put up some fencing.
It sat and sat and sat... waiting for some animals to enclose it.
They also needed a shelter. Friday we poured concrete for the footings. Saturday- a BLAZING hot and dry day, GB and I started work.

Here I am with the 4x4s that hold up the structure
Did I say it was hot?? This photo, I believe was taken after lunch. I was very crabby by then. But we needed to get it done!
We were motivated, because three little goats were waiting to be picked up by us at the end of the month. And they needed a structure!
Here it's almost complete. GB and I added a gutter and a small pond for water. And then Luka, Osiana and I painted it bright yellow!
We're ready for you, goats!